The present work is still at an early stage and detailed proposals and more accurate costs will emerge as more clearing of debris and investigation work is done.

The Diocesan Bell Advisor has recommended replacement of the bell bearings and fittings rather than adjusting and modifying the present ones, this being more economic in the long run.  The bell frame itself appears sound and in reasonable condition.

The cracks in the West wall require further investigation.  Stitching and re-pointing of these will be needed.  The flintwork walls of the stair turret also require strengthening to resist movement from the bells.  Some repairs and strengthening to the foundation beams supporting the frame and to the bell chamber floor are also anticipated.


Details will be determined when the present accumulation of twigs and debris have been cleared from the belfry.